During the refurbishment of West tube in Söderledstunnel we have installed about 24 000 m2 of fire protection on ceiling, fire stops and also noise reduction. We have changed the system of fire protection from spraying to boards to speed up the installation and reduce the negative impact on Environment.
Söderledstunneln, Stockholm, Sweden (2011)
8 February 2017|
References, Tunnel works