Infrastructure

TBT is often hired by contractors around the world to perform fire protection in the infrastructure field. We also carry out other types of functional and aesthetic surface treatment and noise absorption in underground spaces. 

Tunnel builders throughout Europe and other parts of the world hire TBT for an inventory of needs, material selection and design, as well as the execution of fire protection. We also perform work with evacuation doors, sound absorbers and aesthetic clothing.”

Konrad Aurin, Täby BrandskyddsTeknik

References

  • Söderledstunnel west tube Stockholm, Sweden – fire protection and noise reduction, developing alternative solution to substituted fire protection spray material, design and approval process, installation 2011 (24.000 sqm)
  • Riddarfjärdsavfarten Stockholm, Sweden – fire protection tunnel ceiling, coating the tunnel walls, developing a system for fire protection and drainage for segment joints 2012 (2.000 sqm)
  • Port of Miami Tunnel, USA – supervision for fire protection and architectural lining, 2012-2013
  • Tunnel Wagenladungsstraße Stuttgart, Germany – design and installation of passive fire protection, thermal insulation, sub-frame, architectural lining, coating, noise absorption – 2014 (10.000 sqm)
  • Södermalmtunnel Stockholm, Sweden – design and installation of passive fire protection of concrete and steel structures – 2014 (3.000 sqm)
  • Citibanan Project Stockholm, Sweden – installation of 174 fire protection doors and additional fire protection and coating – 2014 -2015
  • Citibanan Project Stockholm, Sweden – installation of 16.000 sqm fire protection boards for concrete and steel structures – 2014 -2015
  • Citibanan Project Stockholm, Sweden – installation of fire protection of heavy steel structures and fire removal duct at station area Odenplan , 6.000 sqm 2014 – 2015
  • Bergisel Tunnel Innsbruck, Austria, installation of 19.000 sqm fire protection and 12.000 sqm coating to the existing tunnel liner, 2015
  • Hämeelinna Tunnel Finnland, installation of fire protection for the tunnel ceiling under traffic, 7.700 sqm -2015
  • Station Markthalle Hannover, Germany, design and installation of suspended HPL ceiling over the tracks. 250 sqm, 2015
  • Granfoss Tunnel Oslo, Norway. Installation of fire protection for tunnel ceiling, walls and fire protection joints, 5.500 sqm, 2015-2016
  • Tunnel Stadlau Hirschstetten Vienna, Austria, Installation of fire protection for tunnel ceiling, noise absorption to tunnel walls, noise absorption to ramp walls, 26.000 sqm fire protection; 10.000 sqm noise absorption, 2015-2016
  • MART Tunnel Abu Dhabi Airport, UAE, Installation of fire protection for the tunnel ceiling, 30.000 sqm, 2016/2017
  • Tunnel Adenauer Platz Berlin, Germany, Installation of fire protection for the tunnel ceiling and walls, fire doors and flaps and tile works for tunnel walls, 4.000 qm, 2016/2017
  • Cityringen Copenhagen, Denmark, design and built of over track exhaust system, fire protection walls and ceiling and niche covers, 10.000 sqm 2017-2019
  • Ring I Espoo, Finnland, installation of 30.000 sqm fire protection for tunnel walls and ceiling. 2017/2018
  • Ekebergtunnel Oslo, Norway, installation of fire protection for the tunnel ceiling, 5.000 sqm 2017/2018
  • Tunnel Mils, Austria, installation of 7.000 sqm fire protection for tunnel ceiling. 2018
  • Gentingmidjan Stockholm, Sweden, installation of fire protection for tunnel ceiling and walls,3.000 sqm 2018/2020
  • Tunnel Noitzmühle, Wels, Austria, installation of fire protection for the tunnel walls and ceiling and coating, 4.500 sqm, 2018
  • Gleinalmtunnel, Austria, installation of fire protection of the tunnel portals, 600 sqm, 2019
  • Marieholm Tunnel Gothenburg, Sweden, installation of cast in fire protection panels, sprayed fire
    protection mortar, fire protection panels, fire protection joints and painting of fire protection, 18.000 sqm, 2016-2020
  • Refurbishment Leopold II Tunnel Brussel, Belgium, Design and Installation of suspended fire protection ceiling. 55.000 sqm and 15.000 sqm of cable ducts, architectural lining 20.000 sqm, noise absorption 4.000 sqm 2019-2022
  • Festningstunnel Oslo, Norway, Installation of 18.500 sqm of fire protection panels for tunnel ceiling and walls, 2019-2020
  • Valerenga Tunnel Oslo, Norway, Installation of 4.500 sqm of fire protection panels for tunnel ceiling and walls, 2020-2021
  • Altstadtringtunnel München, Germany, Installation of 14.500 sqm fire protection for tunnel ceiling, 2020/2021
  • Tangent Mechelen, Belgium, Installation of 14.000 sqm wall fire protection and architectural lining 2021/22
  • Göta Tunnel Gothenburg Schweden, Installation of fire protection panels on extra concrete tunnel liner 2021
  • Sydhavnen Metro Copenhagen, Denmark, Design and Built of an walkable over track exhaust duct, approx 3.000 sqm, 2022
  • Altstadtringtunnel München, Germany, installation of natural stone cladding for tunnel ramps and noise absorption panels, 2022,
  • Altstadtringtunnel München, Germany, additional fire protection and metal works for monitoring system, 2022
  • Tunnel Kortrijk, Belgium, design and built of noise absorption and architectural lining of tunnel walls, 2022

Contact Konrad!

Get help with fire protection for infrastructure

Do you also need an experienced and competent partner for fire protection work in your project? We have supported the really big infrastructure projects across Europe. Konrad Aurin is department manager for infrastructure at TBT. Contact him and plan for your next project together with TBT!