For the refurbishment of the Brynstunnel in Oslo, Norway some fire protections spray was replaced by fire protection panels.
TBT performed the design and installation for Skanska Norge. The installation was done within 8 working nights. Totally about 1.300 sqm where installed.
Brynstunnel in Oslo, Norway
2 August 2019|
Articles, Tunnel works