The extensive refurbishment of the road tunnel in Adenauer Platz included the installation of 4 000 m2 of fire protection boards… Read more
The new tunnel connecting the Port of Gothenburg and Hisingen is partly immersed and partly cut and cover type of… Read more
250 m2 of suspended ceiling from high pressure laminates (HPL) were installed by our tunnel team over the tracks.
While the traffic remained in the tunnel, we have installed 7 700 m2 of fire protection.
As part of refurbishment works we have installed and coated 19 000 m2 of the existing concrete tunnel lining in Austrian… Read more
We have provided the design and installation of approximately 3 000 m2 of passive fire protection of curved concrete and steel… Read more
During the refurbishment of West tube in Söderledstunnel we have installed about 24 000 m2 of fire protection on ceiling,… Read more